Water Well Drilling: How It Works

Short answer

Drilling a water well means a licensed driller bores down with a rig until the hole reaches a water-bearing layer, lines it with casing, seals the gap around the casing with grout, and then the pump, wiring and pressure tank go in. HomeGuide puts the drilling itself at 1 to 3 days for a typical home well, and the whole installation at about 7 days.

Most of what decides how the job goes, and what it costs, happens before the rig arrives: where the well goes, how deep the water is, and what your state or county requires.

Drilled, driven or dug

Not every well is drilled. EPA describes three types:

TypeTypical depthHow it's built
Dug or boredAbout 10 to 30 feetLarge diameter, dug by hand or machine, not cased all the way
DrivenAbout 30 to 50 feetPipe driven into the ground, cased continuously
DrilledCan be thousands of feetPercussion or rotary rig, casing required

Source: U.S. EPA, Learn About Private Water Wells

Drilled wells are the standard for new homes, and for good reason. CDC says it's generally easier to keep germs and chemicals out of a drilled well than a dug or driven one. EPA notes driven wells draw from shallow water and can be contaminated easily. A driven point well still makes sense for a cabin or a garden spigot in sandy ground with a high water table, but it's a poor choice for a family's drinking water.

How the job goes

  1. Site and permit. The well has to sit away from things that can pollute it. CDC lists 50 feet from septic tanks, drain fields and livestock yards, 100 feet from petroleum tanks and stored fertilizer, and 250 feet from manure stacks. Your state may set different numbers. Many states also want paperwork before drilling; Minnesota, for example, requires a notification and fee to the health department before work starts.
  2. Drilling. The rig bores down, bringing up cuttings that tell the driller what rock and soil they're passing through. They keep going until they hit a layer that gives enough water.
  3. Casing and grout. Casing keeps the hole open and keeps surface water out. Household casing is typically 4 to 6 inches across. Minnesota requires watertight casing at least 15 feet below the surface, with grout pumped in from the bottom up through a tremie pipe rather than poured from the top.
  4. Screen and development. In sand and gravel, a screen at the bottom keeps sediment out, usually 3 to 5 feet long on a home well. The driller then pumps the well to clear fines and see how much water it gives. Our page on well yield and recovery rate covers that test.
  5. Pump, pitless adapter and tank. The water line leaves the casing through a pitless adapter below the frost line, and the pump, wiring and pressure tank are installed.
  6. Disinfection and testing. Minnesota's handbook says every new well must be disinfected after drilling, before the water is used for drinking or cooking. Contractors there must have the water tested for bacteria, nitrate and arsenic by a certified lab and send the results to the owner. Wherever you live, ask for a test from a state-certified lab before anyone drinks the water.
  7. The well record. The driller files a construction record with the depth, water level, geology and pump details. Keep your copy with the deed. You'll want it for every repair from here on.

How deep, and how long it takes

HomeGuide says residential wells average 100 to 300 feet deep. A USGS study found a median depth of 142 feet for domestic wells across the lower 48 states. Your driller can't promise a depth before drilling, but neighbors' well records are the best predictor. See how deep a water well is for how to look those up.

On time: 1 to 3 days of drilling, then pump and electrical work, adds up to roughly a week for most jobs.

Can you drill your own well?

Sometimes, legally. HomeGuide notes that some states allow owners to drill on their own land but still require permits and inspections. Minnesota allows a person to build a well for personal use on land they own or lease, as long as it meets state rules.

Practically, a homeowner can drive a shallow sand point. A drilled, cased and grouted well to a safe depth takes a rig, and a bad grout job can let surface water into the aquifer for decades. We'd hire a licensed driller.

What it costs

HomeGuide's national average for a complete residential well is $10,500. Drilling alone runs $20 to $30 per foot, and $30 to $80 or more per foot with the pump, tank and wiring included. The full breakdown is on our well drilling cost page.

Before the rig shows up

  • Mark the septic tank, drain field, buried lines and any fuel tank so the driller can respect the setbacks.
  • Make sure a heavy truck can reach the spot without crossing the septic field.
  • Ask whether the quote includes the pump, pressure tank, trenching and electrical. HomeGuide warns that those parts aren't always in the per-foot price.
  • Put the well as close to the house as the setbacks allow. Longer water and electrical runs cost more.

FAQ

How is a well drilled?

A rotary or percussion rig bores down until it reaches enough water. The driller sets casing, grouts the space around it, and installs a screen if the well ends in sand or gravel. Then the pump, pitless adapter and pressure tank go in.

Can I legally drill my own well?

It depends on your state. Some allow it on your own land with a permit and inspection, and Minnesota allows it for personal use if the work meets state rules. Check with your county health department before you buy any equipment.

How often should a water well be serviced?

CDC says to test the water and check the well for mechanical problems at least once a year. EPA adds yearly tests for coliform bacteria, nitrates, total dissolved solids and pH.

How long does it take to drill a well?

HomeGuide puts the drilling at 1 to 3 days and the full installation at about a week. Hard rock, a deep water table or a permit wait can stretch that out.

Sources

Trade reviewReviewedReviewed by Eric Jackov, plumbing & heating professional with Plumbing Cor Inc, Bayside, NY, on Oct 20, 2026.
Updated

Eric works under NYC Master Plumber License #2128, held by John D'Auito (Tru-Flo Mechanical, Inc.), NYC Department of Buildings. Verify on the DOB list (opens in a new tab)

The numbers on this page come from the sources listed above. How we research and check pages